Torriani Private Ranch

 A private 200-acre Ranch development located on top of Douglas Mountain in Gilpin County.

Project
Description

A Self Sufficient main residence and out-buildings have a remote Photovoltaic and Wind Turbine power system with battery back-up, Solar Thermal in-floor and DHW heating systems. a Net Metering PPA was set up with United Power company.

Project
Data

Location

Gilpin County, Colorado

Grid

“Grid Zero”

Size

200 Acre Ranch

Renewable Energy

20 Kw Photovoltaic and Wind Turbine power systems

Zero Energy, LLC designed and installed the 20 Kw Photovoltaic and Wind Generation Powers Systems with Battery back-up, also utilizing Solar Thermal in-floor heating technologies to assist the main residence and Ranch Power Systems.

Ground Mounted PV
Solar and Wind Systems
Roof Mounted Solar-Thermal System
8KW Back-up Battery System
Ground Mounted PV Railing
Solar and Wind System Set-Up